International Paper Dredge Spoils Basin |
|
|
|
MTG was the design engineer for the 40 acre dredge spoils basin. Preliminary engineering studies were conducted to ascertain the feasibility and cost of constructing the new spoils dredge basin. Size, life and cost estimates were used to determine the final configuration. MTG was able to fast track the field work, perform the initial design for approval by the Texas Natural Resource and Conservation Commission and complete the final design for bid and award within six months.
|
|